Customer introduction

Joint venture company by Shuangtaizi Economic Development Investment Co., Ltd. and China Chemical Engineering Ninth Construction Co., Ltd. There is a chemical plant in the park, which produces a large amount of industrial wastewater. At the same time, there are 5 office buildings.

Custom inquiry

The project has a construction area of 10,326 m2 ,heating area: 10,326 m2, and cooling area: 3,938 m2.The heating temperature is 20 ° C and the heating time is 12 hours. Keep working at low temperature during non-working hours, and the temperature requirement is 5 °C. Artificial and intelligent control are combined.

Effect

Stable System

No need to be on duty, the system can automatically run according to the set temperature.

Remote monitoring and real-time monitoring of system operation status through monitoring center and mobile APP software.

If the running data of the system deviates from the normal value, the system will alarm and promptly perform troubleshooting.


Reduce cost

Self-sufficient heating can be achieved using its own process waste heat.

By using the waste heat source of the sewage, the building is heated and cooled, and the normal discharge of the sewage is not affected at all.


The cost of heating and cooling/per year

Former: 439,000 RMB per year    


After:     220, 000 RMB per year




Panjin Chemical Industry Park SEP Project

Environmentally Friendly
Cost Saving
Remote Control
Easy to Install