Shenyang Conrad Hotel
Heat Efficieny Project

March, 2022  –  July , 2022

Located on the 66th to 88th floors of Hang Lung Plaza, Conrad Shenyang is a stylish new landmark in Shenyang with a 270-degree panoramic view of the city.

https//conrad.hilton.com.cn

NEC Our company led the implementation of the project as Chief Energy Technology Consultant and provided energy saving technology consulting for Conrad Shenyang

                               Introduction


2020:

ØHigh operating costs of hot water through centralized gas boiler
ØHigh CO2 emissions

2020-2021:

ØNECreat developed a unique conceptual design to replace gas boiler operation during the long cooling season(Marach-November)

ØKey technology: Heat recovery by heat pumps

ØSystem decentralization


2022:

ØNECreat implemented the complete project within 120 days depite COVID Lockdow

System comparison
A Successful Completion